Metal Roof Panel Cut List Format: What to Include and How

A contractor's guide to the metal roof panel cut list: the columns to include, how to calculate panel lengths, and how to check it before you order.
A metal roof panel cut list is a table that tells the fabricator exactly what to make: every panel length, how many of each, the profile, gauge and color, plus the trim that goes with them. A good format has one row per unique length, grouped by roof plane, with quantities, total linear footage and a notes column for angled cuts and openings. Get that table right and the order arrives ready to hang. Get it wrong and you pay for short panels, rework or a second delivery. This guide gives you the format we recommend, the math behind each column and a check to run before you send it.
It is written for contractors, builders and estimators ordering custom-length standing seam panels. If you order cut-and-drop panels from us, the cut list is the document that drives the whole job.
TL;DR
- A cut list is the production document: one row per unique panel length, grouped by roof plane, with quantity, finished length and notes for angles or openings.
- Count panels by coverage width, not by the width of the sheet. Size each panel by slope length plus eave overhang, and round up to the inch.
- Hips, valleys and dormers give every panel a different length. List the longest point of each panel and the cut angle, and keep those panels in their own group.
- List trim and flashing separately from panels, by type, length and piece count, so nothing is left off the order.
- Check the list against the layout drawing, the profile and the total linear footage before it goes to fabrication.
Table of Contents
- Cut list, takeoff and layout: how they differ
- What a cut list should contain
- How to calculate the numbers
- Hips, valleys, dormers and other angles
- Check the list before it goes to the shop
- When panels need adjusting on site
- Where the deck and system choice enter the list
- Ordering custom-length panels from us
- Our perspective
- FAQ
- Sources
Cut list, takeoff and layout: how they differ
The three terms get mixed up on job sites, but they are separate steps in one chain.
- Takeoff: measuring the roof from plans or a site visit and pulling out areas, edge lengths and pitches.
- Panel layout: drawing where each panel sits on each roof plane, including where the first and last panels land and how they meet hips, valleys and walls.
- Cut list: the table that comes out of the layout. Each panel in the drawing becomes a length in the list.
Estimating firms describe the same relationship: the layouts correspond directly to the cut list, which after revisions is production ready for the panel manufacturer. That is why we treat the cut list as the thing you finalize last, after the layout is settled. If you want the full sequence, our standing seam takeoff workflow walks through it, and our guide to metal roof takeoffs and 16-inch coverage covers how short orders happen.
What a cut list should contain
A published sample of a 16-inch standing seam cut-list report shows what a manufacturer expects to read. It identifies the project and address, the panel specification, the grouped cut lengths, the quantities, and the linear footage and area. Its totals come to 319 panels and 4,648 ft 6 in of panel material. The same report lists trim and accessory items separately, by type and unit, covering hip, endwall, rake, valley, sidewall, eave and ridge details.
Build yours the same way. Here is the header block and the columns.
Header block
- Project name, job site address and delivery contact
- Profile and seam type (for example, 1-inch mechanical lock or 1.5-inch snap lock)
- Gauge (24 or 26) and finish or color
- Coverage width of the panel
- Panel rib orientation and any special instructions, such as hemmed ends or a specific eave condition
- Revision number and date
The revision line matters more than it looks. When a layout changes, the cut list changes, and the shop needs to know which version is the live one.
Table columns
| Column | What goes in it | Why it matters |
|---|---|---|
| Roof plane | A label that matches your layout drawing (Main-Front, Garage-Left) | Lets the crew sort bundles by plane |
| Mark or ID | A short code for each unique length | Ties the bundle tag to the drawing |
| Qty | Number of panels at that length | Drives total footage |
| Finished length | Feet and inches, rounded up to the inch | The number the shop cuts to |
| Cut type | Square, angled left, angled right, notched | Avoids guessing at the job site |
| Angle or dimension note | Pitch or angle and which end is long | Required for hips, valleys and dormer returns |
| Linear feet | Qty times length | Checks the order total |
| Notes | Penetrations, skylights, field-trim panels | Flags work for the crew |
Keep trim in a second table with these columns: item type, profile or code, length, quantity, color. Our trim package checklist covers what typically belongs on that second list.
How to calculate the numbers
Two questions drive every roof plane. How many panels run across it, and how long is each one.
Step 1: Count panels by coverage width
Coverage width is the width a panel covers once its seam overlaps its neighbor. It is narrower than the sheet. Divide the eave length by the coverage width and round up.
Example: a 40 ft eave in 16-inch coverage panels. 40 ft is 480 in. 480 divided by 16 is 30 panels exactly.
If the number does not come out even, the last panel is a partial width. A very narrow last panel looks wrong and is hard to fasten, so shift the starting point so the two end panels share the difference. Note the field-trimmed panel in the notes column so the crew knows it is coming.

Step 2: Calculate slope length
Panels run eave to ridge, so you need the length up the slope, not the horizontal run. Multiply the run by the slope factor, which is the square root of (1 plus (rise divided by 12) squared).
Example: a 6/12 pitch with a 12 ft run. The run is 144 in. The slope factor is about 1.118. 144 times 1.118 is about 161 in.
Step 3: Add eave overhang and ridge allowance
Add the amount the panel extends past the eave edge. Typical overhangs are an inch or two, with a bit more if the panel discharges into a gutter. Add any ridge setback or hem allowance that your profile calls for, then round up to the next full inch. Confirm those allowances against the panel specs for the profile you are ordering.
Example: 161 in plus a 1.5 in overhang is 162.5 in. Rounded up, that is 163 in, or 13 ft 7 in. If the plane has 30 panels at that length, the row reads: Main-Front, 30 panels, 13 ft 7 in, square cut, 407 ft 6 in of linear footage.

Step 4: Check the length against shipping and handling
Very long panels are fine to fabricate but need to be planned for on the truck and on the roof. If a run is long, decide early whether it ships as one piece or has a planned lap. See how long standing seam panels can be before you lock in the lengths.
Hips, valleys, dormers and other angles
On a simple gable, every panel on a plane is the same length, so one row covers the plane. Hips and valleys break that. Each panel steps shorter or longer than its neighbor, so each one needs its own row, or a grouped row with a clear rule.
The step is predictable. On a hip meeting the eave at 45 degrees in plan, each successive panel loses one coverage width of run. Multiply that by the slope factor to get the change in slope length. For 16-inch coverage on a 6/12 pitch, that is about 16 times 1.118, or just under 18 in per panel.
How to list angled panels:
- Give the hip or valley its own group, labeled by plane.
- For each panel, record the longest point of the finished length. Angled panels are cut from the long end.
- Record the cut angle and which end is long, as seen from the eave looking up the slope.
- If you have a mirrored hip on the other side, list it as the same length but opposite hand, so the shop does not combine left and right cuts.
- Mark panels that will be trimmed in the field because the angle depends on the framing as built.
For penetrations such as chimneys, skylights and vents, give the panel ID, the distance from the eave to the opening, and the opening size. Whether the notch is made in the shop or on the roof is a decision to put in the notes column, not leave to memory.
Walls and dormer returns need the same treatment. Treat each as its own plane with its own eave length and run. A pitch change at a dormer or a lower roof tying into a wall means the panel length changes at that line, so list the upper and lower sections separately.
Check the list before it goes to the shop
Most ordering errors are visible on paper if you look in the right places. Run this check on every list.
- Count against the drawing. The number of panels on each plane in the list should match the number of panel lines in the layout.
- Recompute one row per plane. Pick the longest panel on each plane and redo the slope math from the original measurements.
- Compare linear footage with area. Total linear footage times coverage width, converted to square feet, should land near the roof area from the takeoff, plus a small amount for cuts and overlaps. If it is far off, a plane is missing or counted twice.
- Confirm profile, gauge and color. The header block should match the contract, the sample and the trim.
- Match trim to edges. Every eave, rake, ridge, hip, valley and wall edge in the layout should have a trim line with a length that covers it, with a lap allowance.
- Look at the rounding. All lengths round up to the inch, never down.
- Mark the revision. If the plans changed after the first draft, re-run the affected planes rather than patching one row.
An order built on the real roof dimensions is also the best defense against waste. Our guide to standing seam panel layout and cutting 5 to 10 percent waste shows how custom lengths cut the offcuts that come from stock-length ordering.
When panels need adjusting on site
Even a careful list meets a roof that is not square. Framing runs out of plumb, eaves wander and a wall may sit a half inch off the drawing. Plan for it.
- Measure the first panel. Set the first panel on a true line and check that it is square to the eave before fastening. A first panel that drifts carries the error across the whole plane.
- Plan the closing panel. Put the field-trim panel at a place where the cut is hidden by trim, usually at a rake or wall.
- Keep the margin in the right place. Custom-length panels are cut to your list, so the margin you give them is the overhang at the eave and the allowance at the ridge. Decide those numbers before ordering, not after.
- Record what changed. If you trim a panel on the roof, mark the change on the cut list copy so the next job benefits.
For roofs where site conditions make pre-cut lengths hard to predict, on-site roll forming lets panels be formed at the job and cut to what the roof actually needs. That option is described on our on-site roll forming page.
Where the deck and system choice enter the list
The slope, run length and deck type decide whether a panel can be one piece or needs a lap, and they affect clip type and trim details. Settle these before you finalize lengths. Our metal roof deck types guide explains how slope, run length and delivery interact. If you are still helping an owner choose between roofing materials, a metal roof versus shingles comparison can help frame the cost and lifespan conversation before layout starts.
Ordering custom-length panels from us
We supply architectural standing seam panels in 24-gauge and 26-gauge steel using Englert metal systems, in a 1-inch mechanical lock and a 1.5-inch snap lock profile. Panels are cut to your list and delivered to the job site in Virginia, Maryland, Washington DC, Pennsylvania and West Virginia. We also offer trim and flashing packages, fasteners and accessories, and contractor takeoff support, so the panels and the trim on your list come from the same place.

If you have a list ready, send it through our cut-and-drop delivery page. If you are still working from plans, our contractor supply page is the place to start, and the standing seam metal roofing page shows both profiles.
Our perspective
We think the cut list is the most important page in a metal roof job. Everything before it is measuring and drawing. Everything after it is cutting metal and delivering it. If the list is right, the crew spends its time installing.
That is why we built our business around custom-length, cut-and-drop panels. When each panel is made to the length on your list, there is no stack of stock-length sheets to cut down on the roof, and less scrap to haul away. Contractors on tight schedules tell us the same thing: they would rather spend an extra hour on the list than a day on a short-panel reorder.
Our advice is simple. Finish the layout first. Group the list by roof plane. Give hips and valleys their own rows. Put trim on a separate table. Check the totals. Then send it to a supplier who works with contractors every day and who can also supply the trim, flashing and accessories that go with it, so you are not matching parts from several places.
Matt Catino
FAQ
What is the best format for a metal roof cut list?
A table with one row per unique panel length, grouped by roof plane. Include quantity, finished length in feet and inches, cut type, angle notes and linear footage, with a header for profile, gauge, color and revision. Keep trim on its own table.
How do I list panels for a hip roof?
Give the hip its own group and list each panel by the longest point of its finished length, with the cut angle and which end is long. Each panel steps by the coverage width times the slope factor. Label left and right hips separately so they are not combined.
Should I round panel lengths up or down?
Up, to the next full inch. A panel that is short cannot be fixed, while a panel that is slightly long is trimmed at the eave or ridge. Make the overhang and ridge allowance decisions yourself before ordering so they are consistent across planes.
Can you help with the takeoff if I only have plans?
Yes. We offer contractor takeoff support, and you can reach us through our contractor supply page to start with your plans and work toward a final list.